- Electromechanical assembly under “Turn-Key” modality of 480 ton Plastic spare part painting cabin.
- Electromechanical assembly under “Turn-Key” modality of the 200-ton automobile sealing test and repair cabin.

continental do brasil produtos automotivos ltda.
Camaçari - BA

- Project, supply of materials and assembly of water system supply, auxiliary systems and pipe general distribution, compressed air system, vacuum system and reverse osmosis of automobile and truck tire factories.

durr brasil LTDA.
Camaçari - BA

FORD MOTORS COMPANY automotive complex - Camaçari - BA

- Installation of machineries, equipment and pipelines with material supply for the facilities in PAINT MIX & CIRCULATION units and painting cabin SEALER SYSTEM of FORD Motors Company Brasil Ltda industrial plant.

- Supply of materials for electrical installations at painting cabin PHOSPHATE, E-COAT and PAINT MIX units at FORD Motors Company Brasil Ltda industrial plant.

 Volkswagen and Audi automotive complex - São José dos Pinhais - PR 

- Electromechanical assembly under Turn Key modality of 480 ton Plastic spare part painting cabin for PEGUFORM DO BRASIL. 

- Electromechanical assembly under turnkey modality of Audi’s 200-ton automobile sealing test and repair cabin

taikisha do brasil ltda.
Honda Automóveis do Brasil Ltda. - Sumaré – SP automotive complex

- Electrical assembly and automation of the entire painting "NEW PAINT SHOP" system, under global package modality involving material supply, electrical and automation assembly of the entire painting system, electromechanical installation project and engineering study for the "Tropicalization" of materials governed under rule JIS to ABNT rule, commissioning and start-up.

PIRELLI S/A
Feira de Santana - BA

- Global contract job of electromechanical assembly with application material supply for the tire factory expansion in the frozen water, service central, vulcanization and frieze filling line flow areas.

GENERAL MOTORS DO BRASIL LTDA.
São Caetano do Sul - SP
- Supply under Global package modality of electrical and hydraulic utilities for expansion of "Design Check" and "Spare part warehouse" buildings.
 São José dos Campos - SP unit
- Supply under Global package modality of electrical facilities for iron casting expansion.

MERCEDES BENZ DO BRASIL
Juiz de Fora - MG
- Assembly of 138 KV - 2 x 31,5 / 40 MVA intake sub-station and installation / interconnection of 23 13,8 KV / 220V unit sub-stations.

dopec indÚstria e comÉrcio ltda. - DOW QUÍMICA
Camaçari - BA 
- Mechanical assembly of the bumper-painting cabin, Cold water Central and installation of 12 DOW QUÍMICA painting robots at FORD’s automotive complex. 

- Labor supply for the modification of the project and maintenance per industrial plant management.

eisenmann do BRASIL
Camaçari - BA
- Global contract job of Electromechanical assembly with application material supply.

GOODYEAR DO BRASIL PRODUTOS DE BORRACHA LTDA.
São Paulo - SP
- Supply under Global contract job Modality of Electromechanical assembly and supply of applicative materials of Aqua tubular-like Nebraska/USA natural gas boiler.

 
 
 